Solar Panel Installation
Project Introduction
Floating solar panel systems that harness the sun’s energy to generate electricity will be operational at two reservoirs by the middle of next year.
The systems at the reservoirs will run at 1.5 megawatt-peak (MWp) each, and the electricity generated by them will directly power Bedok Waterworks and the raw water pumping stations at Bedok and Lower Seletar Reservoirs.
The energy generated by the two systems will be equivalent to that consumed by about 800 four-room Housing Board flats for a year, and will reduce the PUB’s carbon emissions by around 1.5 kilotonnes annually – or the equivalent of taking 300 cars off the road.
Project Introduction
Floating solar panel systems that harness the sun’s energy to generate electricity will be operational at two reservoirs by the middle of next year.
The systems at the reservoirs will run at 1.5 megawatt-peak (MWp) each, and the electricity generated by them will directly power Bedok Waterworks and the raw water pumping stations at Bedok and Lower Seletar Reservoirs.
The energy generated by the two systems will be equivalent to that consumed by about 800 four-room Housing Board flats for a year, and will reduce the PUB’s carbon emissions by around 1.5 kilotonnes annually – or the equivalent of taking 300 cars off the road.
Other Projects
Clementi Landslide
Following a significant landslide incident near Ulu Pandan Canal on September 2, Benco Maritime is leading efforts to restore the canal, repair the damaged park connector, and reconstruct the affected slope. Ensuring safety and preventing future flood concerns.
Erection of 3 numbers of belt conveyor and 6nos. mobile hopper at Jurong Port
Benco Maritime's project involves the construction and erection of three belt conveyors, spanning a total length of 1050 meters. These conveyors streamline cement transportation at Jurong Port, enhancing efficiency and reliability.
Pasir Ris Wafer Fabrication Park Revetment Reconstruction Works
Benco Maritime takes the lead in reviving the waterfront of Pasir Ris Wafer Fabrication Park. Through rock transportation and reconstruction work, we're ensuring the safety and vitality of the area, with the support of tug boats and a safety boat.