Clementi Soil Dislodge

Ulu Pandan Canal

Project Introduction

On Sept 2, the landslide caused a massive amount of soil to be pushed into the Ulu Pandan Canal, raising flood concerns, while a short portion of the park connector beside the site was left cracked and broken. One passer-by suffered minor injuries.

Benco Maritime Pte Ltd was appointed as the main contractor to carry out the emergency recover plan to this crisis, involves fully restoring the Ulu Pandan Canal, reinstating the damaged part of Ulu Pandan Park Connector, and reconstructing the slope.

Project Introduction

On Sept 2, the landslide caused a massive amount of soil to be pushed into the Ulu Pandan Canal, raising flood concerns, while a short portion of the park connector beside the site was left cracked and broken. One passer-by suffered minor injuries.

Benco Maritime Pte Ltd was appointed as the main contractor to carry out the emergency recover plan to this crisis, involves fully restoring the Ulu Pandan Canal, reinstating the damaged part of Ulu Pandan Park Connector, and reconstructing the slope.

Project Scope

Restoring the Ulu Pandan Canal

Reinstating the damaged area

Reconstructing the slope

Other Projects

Beyond dredging and revetment, we handle projects like coastal protection, harbor development, and civil engineering within our expertise.
Solar Panel installation at Bedok and Lower Seletar Reservoir

Solar Panel installation at Bedok and Lower Seletar Reservoir

Our floating solar panel systems will soon generate clean energy at Bedok and Lower Seletar Reservoirs. Producing 1.5 MWp of electricity each, they power essential facilities and reduce carbon emissions, making a significant environmental impact.

Erection of 3 numbers of belt conveyor and 6nos. mobile hopper at Jurong Port

Erection of 3 numbers of belt conveyor and 6nos. mobile hopper at Jurong Port

Benco Maritime's project involves the construction and erection of three belt conveyors, spanning a total length of 1050 meters. These conveyors streamline cement transportation at Jurong Port, enhancing efficiency and reliability.

Pasir Ris Wafer Fabrication Park Revetment Reconstruction Works

Pasir Ris Wafer Fabrication Park Revetment Reconstruction Works

Benco Maritime takes the lead in reviving the waterfront of Pasir Ris Wafer Fabrication Park. Through rock transportation and reconstruction work, we're ensuring the safety and vitality of the area, with the support of tug boats and a safety boat.