Revetment Reconstruction Works
Project Introduction
Repair and reconstruction work of revetment was carried out along the waterfront of Pasir Ris Wafer Fabrication Park. Transportation of rocks and reconstruction works were carried out by barges with the assistance of tug boats. A safety boat was also deployed in the vicinity of the working area to warn other craft of the work.
Project Introduction
Repair and reconstruction work of revetment was carried out along the waterfront of Pasir Ris Wafer Fabrication Park. Transportation of rocks and reconstruction works were carried out by barges with the assistance of tug boats. A safety boat was also deployed in the vicinity of the working area to warn other craft of the work.
Other Projects
Clementi Landslide
Following a significant landslide incident near Ulu Pandan Canal on September 2, Benco Maritime is leading efforts to restore the canal, repair the damaged park connector, and reconstruct the affected slope. Ensuring safety and preventing future flood concerns.
Erection of 3 numbers of belt conveyor and 6nos. mobile hopper at Jurong Port
Benco Maritime's project involves the construction and erection of three belt conveyors, spanning a total length of 1050 meters. These conveyors streamline cement transportation at Jurong Port, enhancing efficiency and reliability.
Solar Panel installation at Bedok and Lower Seletar Reservoir
Our floating solar panel systems will soon generate clean energy at Bedok and Lower Seletar Reservoirs. Producing 1.5 MWp of electricity each, they power essential facilities and reduce carbon emissions, making a significant environmental impact.