Conveyor Syetem Installation
Project Introduction
Benco Maritime was assigned to construct and erect total 3 numbers of belt conveyor total length of 1050m to convey cements from the port berthing area to existing conveyors system. The works includes erection of conveyor, test and commissioning of the conveyor system.
Project Introduction
Benco Maritime was assigned to construct and erect total 3 numbers of belt conveyor total length of 1050m to convey cements from the port berthing area to existing conveyors system. The works includes erection of conveyor, test and commissioning of the conveyor system.
Other Projects
Clementi Landslide
Following a significant landslide incident near Ulu Pandan Canal on September 2, Benco Maritime is leading efforts to restore the canal, repair the damaged park connector, and reconstruct the affected slope. Ensuring safety and preventing future flood concerns.
Solar Panel installation at Bedok and Lower Seletar Reservoir
Our floating solar panel systems will soon generate clean energy at Bedok and Lower Seletar Reservoirs. Producing 1.5 MWp of electricity each, they power essential facilities and reduce carbon emissions, making a significant environmental impact.
Pasir Ris Wafer Fabrication Park Revetment Reconstruction Works
Benco Maritime takes the lead in reviving the waterfront of Pasir Ris Wafer Fabrication Park. Through rock transportation and reconstruction work, we're ensuring the safety and vitality of the area, with the support of tug boats and a safety boat.